Commercial & Strata Fitouts
A commercial fitout is a programme management job as much as a building job. We work to your opening date, stage the handover so you can trade as early as possible, and supply the compliance documentation your landlord and body corporate need.
What this job includes.
- ✓Retail fitouts — shop, showroom, clinic
- ✓Office partitioning and refurbishment
- ✓Hospitality fitouts — cafe, restaurant, bar
- ✓After-hours and staged work (minimise disruption to neighbours/tenants)
- ✓Compliance documentation for body corporate and landlord
Every line named, every figure explained.
You get a fixed-price contract with a line-by-line breakdown. Nothing changes without a written variation and your signed approval.
- 1 Site visit and measured scope. We walk the property, measure every room and note every constraint before we price a single line.
- 2 Drawn plans. Scaled floor plans and elevations showing what gets built, where, and how it connects to the existing home.
- 3 Council pathway mapped. DA or complying development, expected timeline, fees, and conditions, all explained before you sign the contract.
- 4 Fixed-price contract. Every inclusion listed, every exclusion named. The price is locked before the first wall moves.
- 5 Programme with dates. A construction programme with start, key milestones, and handover date, issued with the contract.
- 6 Variation protocol. Nothing changes without a written variation order, a revised price, and your signed approval.
What happens, step by step.
Site visit and scope
We visit the property, listen to what you want, measure the existing home, and identify constraints (setbacks, services, soil, flood overlays). No charge for the visit.
Drawn plans and fixed price
We draw scaled plans, price every line, map the council pathway, and present a fixed-price contract. You see the plan, the price, and the permit pathway before you commit.
Council approval and pre-construction
We lodge the DA or CDC, engage the engineer, the certifier, and any specialist consultants, and schedule the build start date once approval is in hand.
Build and handover
One crew builds to the signed plans, on the programmed dates, with progress updates at every milestone. Handover includes a defect walk, certificates, warranties, and a maintenance guide.
The paperwork behind the price.
Public liability to $20M + Home Building Compensation Fund, and a 6-year structural + Home Building Compensation Fund cover, all in writing, all on request.
We hold a NSW Fair Trading contractor licence, public liability and workers compensation insurance, and Home Building Compensation Fund cover on every residential project over $20,000. The warranty names what is covered, for how long, and what is excluded. Ask to see our certificates before signing any contract.
Commercial & Strata Fitouts: common questions.
Can you work after hours to avoid disrupting other tenants?
Read more before you book
See the plan, the price, and the permit pathway before you commit.
Tell us what you want to change about your home. We visit, draw a scope, price every line, and walk you through the council process before you sign anything.